01
Heat pumps
Air-water and hybrid systems for homes, apartments and small commercial buildings. We calculate heat loss per room and upgrade radiators where the numbers ask for it.
- Output
- 4–16 kW
- Lead time
- 3–5 weeks
- From
- €6.850
Installation partner · Eindhoven
Heat pumps, solar boilers, bathroom systems and PV. One survey, one plan, one crew on site, from an 84-home portfolio to a single bathroom in Woensel.
1,840 systems installed since 2014
1,840
Installations completed
27
Housing associations under contract
96%
Handed over on the planned date
12
Engineers on payroll
What we install
We size every system on measured demand, not on a rule of thumb. The same engineers who survey the job install it, commission it and come back for service.
01
Air-water and hybrid systems for homes, apartments and small commercial buildings. We calculate heat loss per room and upgrade radiators where the numbers ask for it.
02
Roof-mounted or heat-pump-assisted hot water, sized on real draw-off. Legionella cycle, frost protection and a tank warranty that survives a Dutch winter.
03
Complete strip and refit: drainage, water, ventilation, tiling and sanitaryware. One crew, one dust screen, one handover with the seal warranty signed on site.
04
Rooftop arrays for housing blocks and commercial roofs, with string monitoring and an annual yield report. Mounting checked against wind load, not guessed.
Process
A project moves from survey to service on a fixed route. The step you are reading highlights as you scroll, so you always know where you are in the job.
The route
Average project: six weeks from survey to handover. Service runs for the life of the system.
We measure heat loss room by room, trace pipe and cable routes, check fuse capacity and photograph every connection point. You get a drawing and a fixed price, not an estimate.
We handle the permit, the grid application and the letters to residents. The planner books a crew, a crane if the roof needs one, and a materials slot that matches the build date.
One crew, one van, one dust screen. We protect the route, work room by room and leave water and heating on every evening. A two-hour arrival window is confirmed the day before.
Pressure test, flush, balance and a handover that actually explains the controls. You get the manual, the warranty pack and a photo record of every concealed connection.
Two service visits in the first year, then annual. Remote monitoring flags a pressure drop or a failing sensor before it becomes a leak or a cold house.
Technical data
Standard configurations, typical lead times and the warranty we put in writing. A survey confirms the final size and price for your building.
| System | Output | Lead time | Warranty | From |
|---|---|---|---|---|
| Air-water heat pump | 4–16 kW | 3–5 weeks | 5 years | €6.850 |
| Hybrid heat pump | 2–8 kW | 3–4 weeks | 5 years | €4.950 |
| Solar boiler | 120–300 l | 2–4 weeks | 5 years | €3.450 |
| Bathroom system | One bathroom | 6–10 days | 10 years | €4.200 |
| PV system | 3–120 kWp | 4–6 weeks | 12 years | €5.950 |
| Service contract | Per unit | Starts within 2 weeks | 1 year rolling | €14,50 / month |
Prices exclude VAT and cover standard installations within 30 km of Eindhoven. Scaffolding, fuse upgrades and radiator replacement are quoted separately after the survey. All work is carried out under BRL 6000-10.
Projects
Four recent jobs, with the numbers we reported to the client. Names are used with permission; addresses are shortened to street level.
Eighty-four hybrid heat pumps, eighty-four radiator upgrades and one street-level plant room. Completed in eleven weeks without taking a single home off supply.
Rooftop PV on six blocks: 612 panels and 248 kWp. Yield is reported to the housing association every quarter, with underperformance flagged within one working day.
Solar boilers and PV for a 1970s terraced block. Hot water demand dropped 41% against the old gas boilers, measured over the first full winter of operation.
Annual service and 24/7 response for 27 housing associations. Average response time last quarter was three hours forty minutes, against a four-hour contract target.
Partners
We work on framework contracts with housing associations, builders and asset managers across Brabant. One planner, one engineer and one number to call per project.
“They planned 84 heat pumps around our residents' shifts, not around their own schedule. Every home was back on hot water by 17:00.”
“The spec table matched the handover pack. In this sector, that almost never happens. We have them on the next two blocks.”
Certifications
Every certificate below is current. We send the full pack with the quote, including public liability cover of €2,5 million per incident.
BRL 6000-10
Kiwa · valid to 12/2027
F-gassen 1 & 2
Kiwa · valid to 09/2028
VCA**
Kiwa · valid to 03/2027
NEN 3140
DNV · valid to 06/2027
InstallQ
Member since 2016
ISSO
Member since 2019
Certificates, insurance details and reference projects on request: certificaten@installatiebrigade.nl.
Quote request
Tell us what you are building, how many units and when you need them. Daan or Ilse comes back within one working day with a survey slot and a price range.
Office
Parkstraat 41
5611 JH Eindhoven
The Netherlands
+31 40 123 45 67
offerte@installatiebrigade.nl
Request received
Daan or Ilse would reply within one working day. Keep this summary for your records.
Before you ask
Yes. We prepare the ISDE application after commissioning and send you the signed report. The rate depends on the installation date and the measured output; we do not promise an amount before the system is confirmed.
One day for a hybrid, two to three days for a full air-water system. If the fuse box or radiators need upgrading, we plan that as a separate day so the house is never without heat overnight.
Yes. We work room by room, protect the route and keep water and heating on every evening. Residents receive a letter and a two-hour arrival window, and the crew lead speaks both Dutch and English.
Four hours for no heat or no hot water, next working day for everything else. Contract clients can call the 24/7 line on +31 40 123 45 68. Last quarter the average was three hours forty minutes.
Five years on heat pump installation, ten years on bathroom waterproofing and twelve years on PV mounting. Manufacturer warranties are on top of that and stated separately in the handover pack.
Yes, within 60 km: Veldhoven, Helmond, Tilburg, Den Bosch and Venlo. Outside that radius we work with two partner crews, under our own project manager and our own warranty.